實施計劃應包括的內容
前三部分的目標主要是讓大家知道影響水損值的主要數據越精確越好。
1.供水量總計量的控制與優化方案
2.抄表及發單收費的優化方案
3.特許的非收費水量的控制與降低方案
接下來的三個部分的主要目標是降低水損每個主要元素。
4.
物理漏損的檢測與降低方案:檢測維修可見與不可見漏水點,更新管網,控制蓄水池溢流。
5.減少水表(負)誤差數量方案,或稱水表圓管理。(即減少慢表,提高收費水表)
6.商業水損的檢測與降低方案(客戶服務管理)
最后,不論使用什么方案降低水損,只有改進公司的運行狀況(架構、流程、人力資源等)才能產生永久的效果。
下表列出了部分通常要求的典型診斷和行動計劃。
|
TYPE OF
LOSS 水損類別 |
|
D:DIAGNOSTIC(*)診斷 |
|
P: ACTION
PLAN(**) |
A |
EFFICIENCY
CALCULATION 效率計算 |
|
|
|
|
|
Volumes produced and
imported 生產及輸入水量與輸出水量 |
DA1 |
Existence of
meters(or not) |
PA1 |
Installation or
replacement of flowmeters |
|
|
DA2 |
Maintenance
procedures |
PA2 |
Improvement of
maintenance procedures |
|
|
DA3 |
Test on
meters |
PA3 |
Tests and calibration
of flow-meters(continued) 調試校正流量計 |
|
Volumes consumed and
billed 認可消費水量和發單水量 |
DA4 |
Diagnostic of
customers procedures |
PA4 |
Improvement of
customers procedures |
|
|
DA5 |
Diagnostic of
information system |
PA5 |
Improvement of
replacement of |
|
Volumes legally
consumed |
DA6 |
Inventory |
PA6 |
Meter installation
campaign (when possible) |
|
|
DA7 |
Measurement or
evaluation procedures |
PA7 |
Reduction of water
service consumption |
|
|
DA8 |
Test of
evaluation |
PA8 |
Reduction of
exonerated consumption |
|
General 概述 |
DA9 |
History |
PA9 |
|
B |
PHYSICAL |
|
|
|
|
|
Visible
leaks |
DB1 |
Statistic |
PB1 |
Improvement or
creation of call centers |
|
|
DB2 |
Audit on
procedures |
PB2 |
Reduction of repair
duration |
|
|
DB3 |
Visual pilot
survey |
PB3 |
Formation of team for
visible leaks detection |
|
|
DB4 |
|
PB4 |
Location of leaks on
GIS |
|
Invisible
leaks |
DB5 |
Statistic |
PB5 |
Purchase of
equipment |
|
|
DB6 |
Audit on method
used |
PB6 |
Formation of team for
invisible leak detection |
|
|
DB7 |
Pilot detection
campaign |
PB7 |
Outsourcing of leak
detection |
|
|
DB8 |
|
PB8 |
Invisible leaks
detection and repair campaign |
|
|
DB9 |
|
PB9 |
Installation of a
monitoring |
|
Leaks on
mains |
DB10 |
Statistic |
PB10 |
Leak detection
campaign with appropriate equipment |
|
|
DB11 |
Audit on
procedures |
PB11 |
|
|
Tank
overflow |
DB12 |
Audit on protection
equipment |
PB12 |
Installation or
rehabilitation of tanks |
|
|
DB13 |
Audit on tele
information |
PB13 |
Remote system
control |
|
Tank
infiltration |
DB14 |
Audit of
drains |
PB14 |
Repair of leaks
and/or waterproof joints replacement 修漏或更換止水縫 |
|
General |
DB15 |
Audit on
sectorisation (districts) |
PB15 |
Waste districts
metering system 廢水排放系統安表 |
|
|
DB16 |
Audit on pressure of
service |
PB16 |
Pressure Control
System |
C |
METERING
LOSSES |
|
|
|
|
|
Undermetering due to
|
DC1 |
Analyse of the
database |
PC1 |
Program of Meter
Replacement |
|
Undermetering due to
|
DC2 |
Sample study on large
customers |
PC2 |
Program of
Replacement or Resizing |
|
Undermetering due to
meter aging |
DC3 |
Sample study on small
meters |
PC3 |
Massive Replacement
Program of small meters |
|
|
DC4 |
Profile of
consumption |
PC4 |
Studies of
meters-datalogging |
|
|
DC5 |
|
PC5 |
Test of new meters
and technical watch |
|
|
DC6 |
|
PC6 |
Purchase of a meter
test bench |
D |
COMMERCIAL
LOSSES |
|
|
|
|
|
Illegal
connections |
DD1 |
Inventory on pilot
area |
PD1 |
Complete
census |
|
Frauds on registered
connectins |
DD2 |
Analyse of the
existing database |
PD2 |
Targeted
census |
|
|
DD3 |
Sample
surveys |
PD3 |
Targeted field
surveys |
|
Frauds on
equipment |
DD4 |
Inventory |
PD4 |
Communication
campaign |
|
|
DD5 |
Sample
surveys |
PD5 |
|
|
Low income
areas |
DD6 |
Pilot
surveys |
PD6 |
Multi-purpose actions
depending |
|
Billing
losses |
DD7 |
Survey on IS and
procedures |
PD7 |
Improvement of
Customer Services of procedures |
(*)通常來講,任務D的黑體部分是最后診斷的內容。
(**)任務P的黑體部分是最常采用的措施。任務D與任務P同行之間沒有關聯。